Al-Bayati, A J, Al-Kasasbeh, M, Awolusi, I, Abudayyeh, O and Umar, T (2021) Trends of Occupational Fatal and Nonfatal Injuries in Electrical and Mechanical Specialty Contracting Sectors: Necessity for a Learning Investigation System. Journal of Construction Engineering and Management, 147(07).

Ali, G M, Olearczyk, J, Bouferguene, A and Al-Hussein, M (2021) Implementation of Combined Loading to Calculate Ground Bearing Pressure under Crawler Crane Tracks. Journal of Construction Engineering and Management, 147(07).

AlOtaibi, M, El-Rayes, K and Altuwaim, A (2021) Optimizing the Renovation Scheduling of Leased Residential Buildings to Minimize Total Project Cost. Journal of Construction Engineering and Management, 147(07).

Altuwaim, A and El-Rayes, K (2021) Multiobjective Optimization Model for Planning Repetitive Construction Projects. Journal of Construction Engineering and Management, 147(07).

Amer, F, Koh, H Y and Golparvar-Fard, M (2021) Automated Methods and Systems for Construction Planning and Scheduling: Critical Review of Three Decades of Research. Journal of Construction Engineering and Management, 147(07).

Benachio, G L F, Freitas, M d C D and Tavares, S F (2021) Interactions between Lean Construction Principles and Circular Economy Practices for the Construction Industry. Journal of Construction Engineering and Management, 147(07).

Bhih, M and Hegazy, T (2021) Enhanced But-For Method to Apportion Net Delays and Accelerations. Journal of Construction Engineering and Management, 147(07).

Brito, D M d, Ferreira, E d A M and Costa, D B (2021) Framework for Building Information Modeling Adoption Based on Critical Success Factors from Brazilian Public Organizations. Journal of Construction Engineering and Management, 147(07).

Cai, J, Yang, L, Zhang, Y, Li, S and Cai, H (2021) Multitask Learning Method for Detecting the Visual Focus of Attention of Construction Workers. Journal of Construction Engineering and Management, 147(07).

Eissa, R, Eid, M S and Elbeltagi, E (2021) Current Applications of Game Theory in Construction Engineering and Management Research: A Social Network Analysis Approach. Journal of Construction Engineering and Management, 147(07).

Fan, S, Yeh, I and Chi, W (2021) Improvement in Estimating Durations for Building Projects Using Artificial Neural Network and Sensitivity Analysis. Journal of Construction Engineering and Management, 147(07).

Gaikwad, S V, Calahorra-Jimenez, M, Molenaar, K R and Torres-Machi, C (2021) Challenges in Engineering Estimates for Best Value Design–Build Highway Projects. Journal of Construction Engineering and Management, 147(07).

Imam, H (2021) Roles of Shared Leadership, Autonomy, and Knowledge Sharing in Construction Project Success. Journal of Construction Engineering and Management, 147(07).

Kifokeris, D (2021) Variants of Swedish lean construction practices reported in research: Systematic literature review and critical analysis. Journal of Construction Engineering and Management, 147(07), 05021005.

Lee, C and Chong, H (2021) Influence of Prior Ties on Trust and Contract Functions for BIM-Enabled EPC Megaproject Performance. Journal of Construction Engineering and Management, 147(07).

Lee, J (2021) Life Cycle Costing for Exterior Materials on Building Façade. Journal of Construction Engineering and Management, 147(07).

Lin, J J and Golparvar-Fard, M (2021) Visual and Virtual Production Management System for Proactive Project Controls. Journal of Construction Engineering and Management, 147(07).

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0002045
  • Abstract:
    Current construction still suffers from significant schedule delays and budget overruns due to inefficient and retroactive project controls programs. This paper developed a visual and virtual project control system that proactively promotes team-based planning and real-time communication of progress and schedule risk. The system benefits from the growth of visual data on construction sites and the increasing maturity level of building information modeling (BIM), to map the current state of production in 3D and expose waste. By modeling production trends, reliability in the future state of production is forecasted to highlight potential delay issues in a location-driven scheme. A visual 3D interface supports collaborative decision-making to eliminate root causes of waste, enables pull flows between people and information, decentralizes work tracking, and facilitates in-process quality control and hand-overs among contractors. This system was implemented on two projects to validate the underlying algorithms. Results show that the system’s functional aspects improve transparency, accountability, and traceability in project execution, and streamline communications between the field and the office. Specifically, 30% PPC increase and four weeks project completion date advance have been observed. Limitations such as resistance to workflow changes could be further improved in the future through early system introduction.

Liu, H, Kwigizile, V and Huang, W (2021) Holistic Framework for Highway Construction Cost Index Development Based on Inconsistent Pay Items. Journal of Construction Engineering and Management, 147(07).

Mathew, S A, Tran, D Q and Nguyen, P H D (2021) Evaluation of Cost Growth Factors in Design-Build Highway Projects Using Structural Equation Modeling. Journal of Construction Engineering and Management, 147(07).

Melhem, N N, Maher, R A and Sundermeier, M (2021) Waste-Based Management of Steel Reinforcement Cutting in Construction Projects. Journal of Construction Engineering and Management, 147(07).

Milošević, I, Kovačević, M and Petronijević, P (2021) Estimating Residual Value of Heavy Construction Equipment Using Ensemble Learning. Journal of Construction Engineering and Management, 147(07).

Musenero, L, Baroudi, B and Gunawan, I (2021) Application of Dual Concern Theory in Elucidating Conflict Behavior in Infrastructure Public-Private Partnership Projects. Journal of Construction Engineering and Management, 147(07).

Okpala, I, Nnaji, C, Awolusi, I and Akanmu, A (2021) Developing a Success Model for Assessing the Impact of Wearable Sensing Devices in the Construction Industry. Journal of Construction Engineering and Management, 147(07).

Rausch, C, Sanchez, B and Haas, C (2021) . Journal of Construction Engineering and Management, 147(07).

Serugga, J, Kagioglou, M and Tzortzopoulos, P (2021) Benefits Realization: Novel Conceptual Model for Front End–Design Decision-Making Using Dempster–Shafer Theory and Quality Function Deployment. Journal of Construction Engineering and Management, 147(07).

Shen, W, Tang, W, Wang, Y, Duffield, C F, Hui, F K P and Zhang, L (2021) Managing Interfaces in Large-Scale Projects: The Roles of Formal Governance and Partnering. Journal of Construction Engineering and Management, 147(07).

Wang, S, Zhu, S and Yuen, P (2021) Assessment of Ground-Borne Vibration Impact on Nearby Underground Facilities Induced by Ground Surface Excavation. Journal of Construction Engineering and Management, 147(07).

Welfare, K, Sherratt, F and Hallowell, M (2021) Perceptions of Construction Work: Views to Consider to Improve Employee Recruitment and Retention. Journal of Construction Engineering and Management, 147(07).

Wu, X and Xu, F (2021) Detection Model for Unbalanced Bidding in Railway Construction Projects: Considering the Risk of Quantity Variation. Journal of Construction Engineering and Management, 147(07).

Zhang, X, Yu, Y, He, W and Chen, Y (2021) Bidding Decision-Support Model for Construction Projects Based on Projection Pursuit Learning Method. Journal of Construction Engineering and Management, 147(07).